Showing 191 results

Archival description
Calgary Herald Photographic collection.
Print preview View:

Students on field trip to ranch

  • Accompanied by newsclipping. Caption: "Field study students get the inside dope on workings of a ranch... Wes Alm...describes operation of his spread west of Claresholm."
  • A copy negative has been added to the file. A reference print has been placed in a separate binder.

Queen Week

  • Frosh queen candidates, September 28, 1967.
  • Jackie Williams with flowers - Frosh Queen, October 2, 1967.
  • Accompanied by newsclippings. Caption: "...It's going to be tough, but somehow a decision has to be made as to which of these three lovely girls is going to end up this year's Frosh Queen at the University of Calgary..."
  • Copy negatives have been added to the file. Reference prints have been placed in a separate binder.

Sports

  • Quarterback tryout for U. of C. football team, September 6, 1967.
  • R.M.C. vs U. of C. - trophy presentation, September 11, 1967.
  • U. of C. Dinosaurs; Mucklow kicks - Edwards holds, September 22, 1967.
  • New U. of C. helmet crests.
  • Accompanied by newsclippings.
  • Copy negatives have been added to the file. Reference prints have been placed in a separate binder.

Girls look at ditch at U of C

Accompanied by newsclipping. Caption: "...The man the two co-eds are watching is working on phase II of the U. of C. tunneling program which, when completed in December, will see needs met for hooking up all exsisting buildings to the central heating and cooling plant. ..." A copy negative has been added to the file. A reference print has been placed in a separate binder.

Concrete panels erected, new U. of C. education building

  • Accompanied by newsclipping. Caption: "Putting the finishing touches on the classroom wing of the new $5,333,000 education building on the University of Calgary Campus is the firm of Stoy Architectural Precast Ltd. ..."
  • A copy negative has been added to the file. A reference print has been placed in a separate binder.

Work on Calgary Hall

  • Accompanied by newsclipping. Caption: "Construction on an additional three storeys on Calgary Hall at the University of Calgary campus is proceeding nicely with the anticipated completion date set for September. ..."
  • A copy negative has been added to the file. A reference print has been placed in a separate binder.
Results 31 to 40 of 191